International Manufacturing Industries
FT. Lowell 1200 Model

Client: Chrisalis Living Design, Dave Stweart

General Contractor: Mark Wright Construction Inc.

Location: 2245 E. Ft. Lowell, Tucson, AZ

Size: 1200 sq. ft.

Order to delivery time: 2 Days (Special Order)

All materials

All load bearing walls and roofing componenets (roof trusses provide by AMS), just before framing work begins.

All materials

Load bearing wall components installed in four hours with a crew of two. Complete installllation including roof takes about 30 man hours.

All materials

Framing in progress. Notice the clean work site.

All materials

Framing work in progress. Lightness of material allows the framer to easily stand and brace the panels.

All materials

Framing work in progress.

All materials

Framing work in progress.

All materials

Components can be made of different heights and shapes.

All materials

Window with back-to-back header.

All materials

Sliding door with back-to-back header.

All materials

Change of wall height.

All materials

Detail of small window and change of wall height.

All materials

Beam pocket assembly.

All materials

Detail of structural hold down.

All materials

Back of beam pocket detail.

All materials

Detail of panel to panel union.